Wing progression


Today appeared to be pretty productive, got quite a bit done in an hour, managed to get the base of the wings glued on, and am halfway through gluing on the upper skin. Twinwall is again proving hard to trim in a nice straight line, especially if you're cutting diagonally across the flutes, so it's a bit messy.


I've had to secure some parts with tape (due to mistakes/trying to get the twinwall to bend), so it does look a bit shabby, but the finished product will be much nicer.


The more I look at the pictures, the more shabby it becomes. I swear it looked nicer in the workshop.

Things to do next session:
  • Finish the gluing
  • Construct the ailerons
  • Attach the wing to the fuselage
I'm still thinking about the optimum angle of attack for our plane (if any). I was initially going for zero, but recent suggestions have said otherwise...

Friday, 7 May 2010

Pt. 2


Some more pictures - we've marked out the twinwall and we are going to glue the bottom and the top section together ( ideally we would have done the bottom section, then folded across the front of the wing, but our material unfortunately wasn't large enough).

After the long break..



Yes, I realise there hasn't been an update for quite some time now, but now we are striving to get as much work done as possible before the term ends. But first, a few pictures and updates, to get an idea of the progress we've made.


We've completely glued the wing ribs to the spar and also have marked out the twinwall to skin the wing with (yes, I know this is very littel progress but holidays have limited, well absolutely blocked, access to the workshop)

Wednesday, 24 March 2010

Nothing much to say

The MQ-5 Hunter by Northrop Grumman definitely seems like the kind of plane I want to see our project evolving into (on a different scale of course, and our ribs below definitely seem quite amateurish compared to the months of research and development that went into the Hunter).


Didn't really do much last tuesday, just finished off the wing ribs (turned out we had completely missed out a pair!) and finished drilling all the holes for the carbon spar, speaking of which, is completed.

Tuesday, 16 March 2010

Picture Update


Sunday, 14 March 2010

Making the wings + attachment?

We finished the fuselage spine (and we cut a few more holes in it to allow for cable management). We've been working on some foam nosecones and underbody to take the landing, but unfortunately a certain someone made a right mess of it. Anyhows, we'll probably be evolving it into an acrylic nosecone for a FPV camera mounting.

As far as the wings ar concerned, the most of the wing ribs have been completed, shaped and sanded to size, but we've still to add weight-saving holes and a hole for the carbon spar to go through. After that it's a case of putting them on the spar and skinning it with some 2mm twinwall. Once that's done, we have the nightmare of attaching it to the fuselage, a problem presented due to the lack of foresight on my part. I was initially hoping for some kind of removable wing attachment, but that dream is long gone...

After that, we've to sort out the control surfaces, and I've got a pretty good of how the ailerons are going to work, as well as the elevators. We've also acquired some new hardware, as our previous electronics were, well, a bit cheap (and they definitely won't be able to cope with the bigger airframe).

Partner's comment repost

[This is a comment from my partner, reposted as a post as he forgot the password to the blog, as it is somewhat important]

It’s probably about time that I say something, so here goes.
In terms of actual progress the completion of phase 1 was a pretty fulfilling experience seeing as it really pissed me off in its initial stages. The transgression into phase 2 is just as my colleague says; in its infant stages whereby the physical airframe needs to be constucted from twinwall, sintra and cabon fibre alike.
If I decide to grace this blog with my presence at some point in the future, and thats a big IF, i’ll probably be updating this progress sheet with intel on the electronic side of the project.
At this current moment in time the autopilt system is to be installed using the ardupilot system. I have recently come into possession od the various processor boards, GPS Modules and airspeed indicators but for the time being it seems that the airframe is going to require more attention.

And that’s about it…

So long.